top of page

Client: Horsham District Council

Project Value: £2 million

Project Type: New build leisure centre

Steyning Park Leisure Centre

 

Steyning Park, a new build leisure facility was designed for use by Steyning Grammar School and the general public.  The pool provides a new eight lane 25m long pool with modern changing facilities for the pool and adjoining leisure centre.

 

PinnacleESP was appointed to design the building services; pool air handling systems; drainage and pool filteration.  The building services included the latest water cleanliness and disinfection central systems, utilising U.V. and ozone filtration whilst maximising energy conservation measures through.  Low energy air handling equipment provided high heat reclaim values whilst maintaining close temperature and humidity levels throughout the pool and changing environment.

 

 

 

 

 

 

 

 

bottom of page